Ground-mounted solar investors, project developers and corporate clients.
From installation to operation
The installation scope and required checks are completed before commissioning. We coordinate acceptance procedures with project conditions and assessments by the relevant organisations.
Handover supported by documentation
Equipment information, test records and project documents are brought together for handover. Technical information needed during operation should remain accessible.
Maintenance for continued operation
Maintenance and performance assessment are planned using the current condition and operating records of the plant. Activities are defined according to site conditions and equipment requirements.
The difference between installation completion and technical handover
Completion of module installation does not mean every handover requirement has been fulfilled. Electrical and mechanical checks, test records, equipment documents and any outstanding work are reviewed together. Access to documents and arrangements for operating support should be clear at handover. Acceptance by the relevant organisations remains subject to their own assessment.
Maintenance scope follows operating and site records
Reduced generation alone does not establish the cause of a fault. Monitoring data, alarms, equipment information and previous interventions should be reviewed together. Cleaning, mechanical observation and electrical checks are distinct activities and should be defined separately in the maintenance plan. Recording work, findings and follow-up items supports the next assessment.
Service scope
- Installation and equipment checks
- Electrical testing and commissioning coordination
- Acceptance procedures, technical handover and project documentation
- Maintenance, module cleaning and performance assessment
Frequently asked questions
Is solar maintenance only module cleaning?
No. Cleaning can be one part of maintenance. Equipment, connections, site conditions, monitoring and fault records are also assessed. Checks are defined according to the needs of the plant.
Can you specify a fixed maintenance interval?
One interval cannot be assumed suitable for every plant. A plan is developed using manufacturer requirements, site conditions and operating records. Suspected faults or safety concerns should be referred to qualified technical personnel without waiting for routine maintenance.
Which records should I bring to a maintenance discussion?
Share the equipment list and project documents, generation and alarm records, previous maintenance reports and dates of the observed issue. These inputs help define the scope of the site assessment.