WHO WE WORK WITH
Ground-mounted solar investors, project developers and corporate clients.
Installation starts with the site
Topography, ground information and the project layout form the basis of mechanical installation. The selected mounting system and connections are considered within this technical framework.
A coordinated installation sequence
Material deliveries, distribution on site and installation sequencing are planned together. Mechanical works are scheduled to support the electrical installation.
Attention to installation details
Module placement and connection details are checked against manufacturer documentation and project requirements. Completed work is recorded in line with the handover scope.
Why does mounting-system selection depend on the site?
Slope, ground data, layout and module specifications must be assessed together. Rather than directly copying foundation or connection details from another plant, the project design and manufacturer documentation should be used. Working areas, service roads and access to electrical equipment also need to be considered alongside the module rows.
Materials and installation coordination on site
Delivery of materials alone does not mean installation is ready to begin. Delivery sequencing, storage areas, equipment movements and inspection of completed work are planned together. Checkpoints for structures and module connections are aligned with design and manufacturer requirements. Completed areas are handed over to the electrical team through a coordinated work programme.
Service scope
- Mechanical preparation to suit the site and layout
- Mounting system and support structure installation
- Module placement and mechanical connections
- Installation checks and work-package coordination
Frequently asked questions
Can solar modules be installed on sloping terrain?
Suitability cannot be determined from slope alone. Ground conditions, topography, mounting-system design and access must be reviewed together. The installation method follows a project-specific technical assessment.
Are mounting structures and module installation considered together?
Yes. Structures, module placement and mechanical connections are planned as a coordinated package. Procurement and installation responsibilities are clarified alongside the technical documents for the selected system.
What should a mechanical installation proposal specify?
It should document the mounting system and modules, foundation works, material responsibilities, site conditions, inspection and handover expectations. Comparing module counts alone does not establish scope boundaries.