WHO WE WORK WITH
Ground-mounted solar investors, project developers and corporate clients.
Infrastructure designed with the layout
Module rows, inverter locations and site access influence electrical planning. Installation is coordinated in accordance with the approved design and equipment requirements.
Clearly defined connection boundaries
The technical specification defines the electrical works within the plant and the responsibilities extending to the connection point. Transformer, switchgear and medium-voltage (MV) connections are carried out to the project conditions and approved technical scope.
Testing and records
Installation checks, electrical tests and handover documents form part of the commissioning plan. We place importance on recording the completed work.
Are DC, AC and MV works the same scope?
Module-side DC connections, AC infrastructure downstream of inverters and medium-voltage connections are distinct work packages. Procurement and installation responsibilities for cables, switchboards, transformers and switchgear should be recorded separately. Works up to the connection point and those within the plant are reviewed together, using the available approval and connection documents.
The electrical handover file
After construction, the operating team needs not only functioning equipment but also documents explaining the installation. Current designs and equipment information, cable and switchboard identification, completed test records and outstanding items should be included in the handover plan. Qualified technical personnel determine testing methods and assessment criteria using the relevant design and manufacturer documents.
Service scope
- DC and AC cabling, cable routes and trenches
- Inverter, switchboard, transformer and medium-voltage (MV) connections
- Earthing and electrical protection
- Electrical testing and commissioning coordination
Frequently asked questions
Do you also undertake transformers and MV connections?
Yes. Transformers and medium-voltage connections are within our service offering. Equipment procurement, site works and responsibilities at the connection point are defined using the project documents.
Which documents are needed for electrical infrastructure?
Existing electrical drawings, the layout, connection information and an equipment list support the assessment. Missing documents or those awaiting revision should also be identified at the outset.
Can electrical works be planned before mechanical installation is complete?
Planning should be coordinated. Inverter positions, cable routes and module arrays influence each other. The construction sequence is then determined by the approved design, access and workplace safety conditions.