YDK MÜHENDİSLİK / SERVICES

Electrical Infrastructure and Connections

We plan electrical infrastructure alongside the mechanical layout and site conditions. Cable routes, equipment connections, protection, earthing and testing are implemented to the project requirements.

Work area, equipment and internal access roads between module rows

WHO WE WORK WITH

Ground-mounted solar investors, project developers and corporate clients.

Infrastructure designed with the layout

Module rows, inverter locations and site access influence electrical planning. Installation is coordinated in accordance with the approved design and equipment requirements.

Clearly defined connection boundaries

The technical specification defines the electrical works within the plant and the responsibilities extending to the connection point. Transformer, switchgear and medium-voltage (MV) connections are carried out to the project conditions and approved technical scope.

Testing and records

Installation checks, electrical tests and handover documents form part of the commissioning plan. We place importance on recording the completed work.

Are DC, AC and MV works the same scope?

Module-side DC connections, AC infrastructure downstream of inverters and medium-voltage connections are distinct work packages. Procurement and installation responsibilities for cables, switchboards, transformers and switchgear should be recorded separately. Works up to the connection point and those within the plant are reviewed together, using the available approval and connection documents.

The electrical handover file

After construction, the operating team needs not only functioning equipment but also documents explaining the installation. Current designs and equipment information, cable and switchboard identification, completed test records and outstanding items should be included in the handover plan. Qualified technical personnel determine testing methods and assessment criteria using the relevant design and manufacturer documents.

Service scope

  • DC and AC cabling, cable routes and trenches
  • Inverter, switchboard, transformer and medium-voltage (MV) connections
  • Earthing and electrical protection
  • Electrical testing and commissioning coordination

Frequently asked questions

Do you also undertake transformers and MV connections?

Yes. Transformers and medium-voltage connections are within our service offering. Equipment procurement, site works and responsibilities at the connection point are defined using the project documents.

Which documents are needed for electrical infrastructure?

Existing electrical drawings, the layout, connection information and an equipment list support the assessment. Missing documents or those awaiting revision should also be identified at the outset.

Can electrical works be planned before mechanical installation is complete?

Planning should be coordinated. Inverter positions, cable routes and module arrays influence each other. The construction sequence is then determined by the approved design, access and workplace safety conditions.

LET'S DISCUSS YOUR PROJECT

Start with your requirements.

Let's define the technical scope and delivery roadmap for your ground-mounted solar project together.

No analytics, advertising or third-party tracking cookies are used. Google Maps and Instagram open only when you follow their links.

Preference storage

Stored locally in your browser to remember your choice. It expires after 180 days.

Required
Privacy and cookie information