YDK MÜHENDİSLİK / SERVICES

Turnkey Ground-Mounted Solar

We approach a ground-mounted solar project as a whole, from its technical framework to commissioning. Electrical, mechanical, civil and perimeter security work are coordinated within one project plan.

Panoramic view of a solar plant on sloping terrain and its surroundings

WHO WE WORK WITH

Ground-mounted solar investors, project developers and corporate clients.

One project, coordinated responsibility

Site preparation, mounting structures, module installation and electrical works do not proceed independently. We plan work packages, procurement and the site programme together, maintaining technical coordination throughout execution.

From project decisions to site execution

The initial assessment considers site information, available project documents, connection conditions and target capacity. Technical needs, the execution programme and commercial scope are defined on that basis.

Handover with a defined scope

Deliverable work items, equipment, tests and documentation are defined at the start of the project. The contract and technical specification clearly establish the turnkey scope.

What should you compare when choosing an EPC contractor?

EPC brings engineering, procurement and construction together. Comparing module and inverter lists alone is not enough for a ground-mounted solar project. Site preparation, mounting structures, cable routes, transformers and connection works, perimeter security and handover documents should be reviewed within the same scope. In an initial discussion, YDK reviews the available design and site requirements to clarify responsibility for each work package.

Moving from a proposal to construction

Site location, target capacity, available design files and connection status form the basis of a proposal. Outstanding information should be identified separately so that its assumptions are clear. Before construction, the equipment list, programme, site handover conditions and technical deliverables are reviewed together. Cost and duration cannot be assumed to be identical for every site before these inputs are established.

Service scope

  • Site surveys, design and engineering planning
  • Equipment and materials procurement to the project scope
  • Earthworks, site preparation, mechanical and electrical installation
  • Transformers, medium-voltage connections, perimeter fencing and CCTV
  • Testing, commissioning, acceptance and maintenance

Frequently asked questions

How does turnkey ground-mounted solar differ from installation-only services?

Installation-only services cover defined site works using specified equipment and designs. Turnkey EPC combines engineering, procurement and construction. The proposal and contract should still explicitly define which permitting, connection, testing and maintenance activities are included.

What information determines the cost of ground-mounted solar installation?

Alongside capacity, the assessment considers ground conditions and slope, site access, equipment selection, electrical connection scope and ancillary infrastructure. A price stated only per MW does not mean all of these works are included on the same basis.

How should I prepare for an initial EPC discussion with YDK?

Share the location and land parcel details, target capacity and available layout and connection documents. Distinguishing completed documentation from outstanding steps allows technical assessment and construction planning to start from the correct project stage.

LET'S DISCUSS YOUR PROJECT

Start with your requirements.

Let's define the technical scope and delivery roadmap for your ground-mounted solar project together.

No analytics, advertising or third-party tracking cookies are used. Google Maps and Instagram open only when you follow their links.

Preference storage

Stored locally in your browser to remember your choice. It expires after 180 days.

Required
Privacy and cookie information